Why the OGWA matters to You, and the Groundwater Industry!
Contributed by the OGWA Board
I hope this article finds you well, as an Industry (PI). The Ontario Ground Water Association (OGWA) and the National Drilling Association (NDA), through their directors, were involved with a flowing artesian Residential Well in West Central Ontario that was facing a Directors Order from the MOECP. OGWA staff discussed work processes, well construction techniques, and even attended the site itself. In collaboration with senior board members, Qualified Hydrogeological Consulting Engineers, and other Industry professionals, there were comments and concerns that caused some to take a serious interest in the matter.
In short, the MOECP had put the Well Owner and the Well Contractor under obligation to decommission/Abandon the well. When reviewing the well’s initial history, OGWA members and other groundwater Professionals confirmed that its construction was compliant with the Provincial Legislation (O.Reg 903) and that it was properly sealed when handed over to the owner. The well remained unused and sealed for approx. one year. However, at a later point a plumber, who was not licensed by the MOECP, later performed non-compliant work, resulting in the well’s out-of-compliance status with O.Reg 903. At that time, it seemed like some simple remedial steps could restore the wells compliance, but with a seemingly broader interpretation of well construction Regulations by the MOECP, that was not the case, and an Order to Decommission/Abandon the well followed.
For context, the Directors Order was primarily focused on a possible “unsealed annular space” which may or may not have existed below the 6m+ surface seal. For further context many who have been involved with the groundwater industry in Ontario for many years will remember some changes made to O.Reg 903, that took various old and new drilling methods into consideration, with the goal of having a regulation which maintained groundwater safety and allowed standard drilling practices to coexist. The major adjustment back then was that a minimum of 6m of enlarged and appropriately sealed annular space must exist around well casings below ground surface, excepting a few unusual situations. Typically, the leading edge of well casings as they are advanced below the 6m enlarged annular seal area require a drive shoe of one type or another depending on the drilling method. This is not a unique thing to Ontario as it is a standard practice virtually worldwide. Yet as anyone who advances casing knows, there needs to be some relief annulus created or the friction forces on the outer casing wall will eventually hinder its advancement. This was a clear reason back then for the adjustment of the regulation. The unfortunate part is that there are some gaps particularly in the understanding of what the 6m surface seal was designed to accomplish and what subsequent drilling would or could exist below it. At the time the adjusted legislation was introduced, many contractors quickly took exception to the wording in the legislation, as they recognized the serious implications of the words as written and many challenged them at the time. However, Ministry staff who were introducing the new legislation to contractors at the time, also understood the concerns of the contractors (as well as equipment limitations) and insisted this did not apply to drive shoe applications and that the very purpose of the 6m seal was to provide adequate protection from surface water impacts. Moreover, it was also clear that the legislation was not going to be opened again anytime soon for revisions. Subsequently, assurances were given to all contractors of exactly how the Ministry of the day was interpreting and enforcing the adjusted legislation. The details surrounding this older adjustment have unfortunately not been well communicated over the years inside the modern MOECP, thus more work needs to be done on this front by all stakeholders.
Back to the issue of compliance, based on a possible annular space, the MOECP’s current interpretation was that the well in question was not constructed in a compliant manner. You might remember however, that an unlicensed person was involved some time after the well was constructed and at that time work was done which wasn’t compatible with the Regulation. It was this that started the ball rolling so to speak and eventually lead to the Order to decommission the well as noted earlier. Once the MOECP technical staff reviewed the well record they were no longer focused on the repairable mistakes made by the unlicensed person, but rather on the wells annular seal.
Over a considerable period of time and many emails and phone calls later, OGWA & NDA members as well as the owner were able to meet with MOECP staff in person, to discuss the well and the details leading to the MOECP requirement to decommission an otherwise normal and functional well.
The concern that was relayed to the MOECP as being of the utmost importance to OGWA & NDA was that essentially, they were requiring this wells construction to have met the Best Management Practices guidelines, rather than O.Reg 903. As an industry we were not in agreement with the MOECP’s position on that. Dialogue back and forth continued, with points being noted from both parties. One disadvantage on the MOECP’s part was that there was no longer any senior staff who were present when the changes were made to O.Reg 903, many years ago. The problem which kept arising, was that there was no way to resolve the potential micro-annular space created by the drilling process in the view of the MOECP, when applying the regulation as they now understood it, and the Well Record details. With that in mind the OGWA & NDA were tasked with reviewing any and all old correspondence, as well as contacting personnel who may have been around or involved when the noted changes were made to the Regulation. There were fortunately some who were familiar with the changes and the reasons behind them, which proved to be a huge help in handling this matter, especially in communicating the viewpoints of both parties correctly. As noted earlier there were things that needed to be done to improve the wellhead, which the MOECP for the most part agreed with, after additional review the Directors Order to Decommission/Abandon the well was rescinded, albeit with a number of requirements to be met.
If you are a well contractor, drilling technician or groundwater professional, you should be interested in why the OGWA & NDA took such a vested interest in this well and the circumstances surrounding it. If the Directors Order had remained in effect and the well owner & contractor had been left with no choice but to comply, it would have set a dangerous precedent in the opinion of the industry, based on the understanding and interpretation it was given and has accepted for several decades. This set of circumstances may have good results moving forward, in the hope that it will revive a channel of communication and dialogue that has been sorely missed for some time.